The team at Shaw’s have worked with several cable logging contractors to develop a Hauler Production Diary. The new diary records individual drag details, along with practical information on time spent with rope shifts and downtime. The diary also provides the ability to track extraction system details, which can be useful to analyse at the end of each week. You can download a copy here or call the team and have a hard copy included in your next order.